Project HIghlights

  • $600k Construction Cost
  • Completed 2020
  • Civil Design:
    • Street Plans
    • Reconfigured Access Ramps & Driveways
    • Right of Way Acquisition Coordination
    • Land Surveying
    • Traffic Signal Modifications
  • Utility Relocation (SCE overhead, Charter, Frontier, MWD, Suburban Water)

Project Description

CNC provided complete design and construction support services for addition of a right turn pocket on NB La Mirada Blvd at Imperial Highway and Right Turn Pocket on WB Imperial.

Imperial Highway at Telegraph Road. R/W Acquisition: CNC worked with Paragon to prepare legal descriptions and plats and R/W acquisition services for permanent takes and temporary construction easements (TCE) at two lots on the adjacent shopping center.
Storm Drain / Traffic Design: CNC provided complete survey and design services for roadway geometrics, reconfiguration of access ramps and driveways, modification of the traffic signals, and relocation of catch basins and realignment of the storm drain network in Imperial Highway.
Utility Relocations: CNC also prepared relocation notices and worked closely with Edison, for relocation of their overhead transmission line on Imperial Highway along with Charter, Frontier, MWD and Suburban Water District for relocation of their facilities.