Project HIghlights

  • $2.3M Construction Cost
  • Completed Summer 2021
  • Civil Design:
    • Street Reconstruction Plans
    • Cold Central-Plant Recycled Asphalt Concrete
    • Streetlight Design
    • Safety Guard Rails Installation
    • New Sidewalks
    • Signing and Striping Plans and Traffic Control

Project Description

Arenth Avenue stretches nearly 2.7 miles from Anahiem-Puente Road to Nogalas Street. Phase 1 was completed in the summer of 2021 from Anahiem-Puente Road to Philips Drive. CNC designed the replacement of all 5,000 linear feet of asphalt pavement and base with new asphalt pavement and PCC pavement on crushed aggregated base over geogrid for add strength of the road. Also included on the project was the repair of existing PCC curb and gutter at various locations, the adjustment of utility manholes and valves, temporary traffic control, pavement striping and pavement markers, and streetlight design.