Harbor Boulevard Resurfacing

City of Costa Mesa

 Highlights:

– Design Survey
– Rehabilitation Plans
– Traffic Control Plans
– Walk-Through with City Representatives

CNC prepared the PS&E for the resurfacing and rehabilitation of approximately 4,300 lineal feet Harbor Blvd from south of Baker Street to north of South Coast Drive. Tasks completed by CNC included field survey and mapping, utility coordination, field reconnaissance to identify areas of pavement distress and damaged sidewalks and curb & gutter, preparation of roadway rehabilitation and resurfacing plans, traffic control plans, specifications and opinion of probable construction cost.

CNC attended walk through with City representatives. CNC also processed the plans through Caltrans to obtain an encroachment permit for design survey and construction within Caltrans jurisdiction at the I-405 crossing.